Sabine Creek Wastewater Treatment Plant Expansion

Project Overview

WHAT: Expansion of Sabine Creek Wastewater Treatment Plant from 1.5 MGD to 3.0 MGD average daily flow

WHY: To provide additional capacity to support the population growth of Royse City and Fate

HOW: Adding two new pumps and increasing firm pumping capacity to 9 MGD, two aeration basins, third secondary clarifier, pre-engineered operations building, headworks structure

WHERE: Located in Royse City, benefits Cities of Royse City and Fate

WHEN: Design started in September 2015. Construction started in December 2016. Final completion in February 2019.

HOW MUCH: $9.2 million